Many facilities were inundated due to flooding caused by Typhoon No.19 “Hagibis”.※1
As a result, some facilities are currently closed.
Please refer to the list of facilities open/closed below.
<Facilities open>
- Main Building
- Plaza of Water Mills
- Grand Water Mills ※2
- Grand Ceramic Picture
- Arakawa Landscape Model 173
- Rest House
- Parking Zone 1
- Parking Zone 2
- Arakawa Waku-waku Land
<Unusable facilities>
- Stream Observation window
- Fountain Plaza
- Toilet near Stream Observation window
- Toilet and changing room near Fountain Plaza
- Sand Square
- Parking Zone 3
- Downstream bridge ※3
※1 Time-lapse video of the flood is shown at River Hall.
※2 Grand Water Mill may be stopped depending on the weather condition.
※3 The bridge was washed away by the river.